Experience K12 Cadillac Public Schools Elementary Renovations Cadillac Public Schools Cadillac Public Schools Elementary Renovations Cadillac, Michigan TowerPinkster worked with Cadillac Public Schools and The Skillman Corporation to complete projects throughout the district as a result of their successful 2018 bond campaign. Franklin and Lincoln Elementaries are newly completed and boast interior finish upgrades and cafeteria and classroom additions to address the growing student population in the district. In the two-story addition at Lincoln Elementary, over 25,000 SF of classroom space was added. The materials used in the new construction at each facility blend well with the existing building. The bus loop and drop-off areas were redesigned to improve the safety and security of student pick-up and drop-off.